Dependency links.
FS, SS, FF, SF, the way real shops sequence work.
Link operations the way your routings actually describe them. Udyog Planner supports all four standard dependency types with visible arrows on the grid.
The shape of dependency links.
Click-to-link
Draw a dependency by dragging from one operation to the next. Pick the constraint type from a quick menu.
Cascade reschedules
Move a parent operation and every downstream task moves with it, respecting working hours and machine availability.
Always-visible arrows
Links render on the grid as you plan, so you spot orphaned operations or impossible sequences immediately.
Everything in dependency links.
Finish-to-Start, Start-to-Start, Finish-to-Finish, and Start-to-Finish, every constraint your routings need.
Click a bar, drag to another bar, pick the type, the dependency is drawn instantly.
Lead and lag offsets per link, in minutes or hours.
Chain reschedules: moving a parent automatically nudges its successors forward.
Cycle detection prevents impossible loops at the source.
Dependency links · questions.
Can’t find what you’re looking for? Reach out, we read every email.
What happens if a downstream operation has no slack?
The link is flagged with a conflict marker. You can either accept the overlap, push the successor out, or split the work.
Can I import dependencies from an ERP routing?
Bulk import is on the roadmap. For now, dependencies are drawn manually on the grid or via the operation detail panel.